| 1825 Way |
S50 Works - connection to new Amazon site
From sub-station to roundabout
Lane closures required off peak - lane 1 northbound
|
Lane closure
|
1 Jun 2026 |
31 Aug 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: ARN-738-58208308
|
| A177 From The Howden Bridge To Thorpe Larches |
Cabling & joint box works
From Thorpe Larches past Grindon Crossroads
Rolling 2 Way & Multi Way Signals required manned
Traffic Management by Sunbelt - 01452 418660 Option 3
|
Multi-way traffic signals
|
13 Jun 2026 |
13 Jun 2026 |
BT
contact details (opens in a new window)
Reference: BC008WG9VP89ZSB
|
| A177 From The Howden Bridge To Thorpe Larches, Stockton-on-Tees |
Between Thorpe Thewels and Borough boundary. fibre cabling works for new solar farms.
Sinewave/PBU Limited.
Works to take place between 1700hrs 12th June until 0700 15th of June.
2-way temp lights required, TM by Sunbelt Rentals - 07845657815
|
Two-way traffic signals
|
12 Jun 2026 |
15 Jun 2026 |
Eclipse Power Networks
contact details (opens in a new window)
Reference: TR004SINEWAVE6563FIBRE
|
| Belasis Avenue |
Installation of new HV cable
From side of Electricity Distribution site to site entrance
2 Way Signals required manned at peak times
Traffic Management by Applebridge - 07936 935172
|
Two-way traffic signals
|
28 May 2026 |
9 Jun 2026 |
Global Utility Connections
contact details (opens in a new window)
Reference: XV045SIS001_S3
|
| Bishopton Road West |
Junction with Barlborough Avenue/adjacent to Sainsbury's. works to replace damaged frame+cover in carriageway.
NWL/ESH UK
M/way lights Required - Traffic management by Road Safe Uk - 0191 4146999
works to be done of normal hours and after supermarket closes - 2130hrs.
|
Multi-way traffic signals
|
22 Jun 2026 |
23 Jun 2026 |
Northumbrian Water
contact details (opens in a new window)
Reference: JF0014000-7565
|
| Black Wood |
Black Wood, Wynyard
Various Patch repairs to the sewer - No Excavation
Traffic management by Total Resources
|
Road closure
|
22 Jun 2026 |
22 Jun 2026 |
Northumbrian Water
contact details (opens in a new window)
Reference: JF001SN4004-0019PD
|
| Concorde Way, Stockton-on-Tees |
Electric supply to Amazon
Near Bowesfield Lane / Queen Elizabeth Way roundabout
Lane 1 closure east and westbound from 13th June to 5am 15 June
|
Lane closure
|
13 Jun 2026 |
15 Jun 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: ARN-738-68187123
|
| Concorde Way, Stockton-on-Tees |
Electric supply to Amazon site
Near Bowesfield Lane / Queen Elizabeth Wat roundabout
Lane closures required - lane 2 and central reservation from 6th June to 5am 8th June
|
Lane closure
|
6 Jun 2026 |
8 Jun 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: ARN-738-43444986
|
| Cowpen Lane, Billingham, Stockton-on-Tees |
CCTV survey to the sewer
Outside 12 Cowpen Lane
Rolling 2 Way Signals off peak and manned
Traffic Management by TM Lincs - 07930 26802
|
Two-way traffic signals
|
10 Jun 2026 |
10 Jun 2026 |
Northumbrian Water
contact details (opens in a new window)
Reference: JF001CW4111-20301082JA
|
| Durham Lane |
Construction of a cycle and walking path along the western verge of Durham Lane
From Elton Interchange to Cleasby Way
2 Way and Multi Way Signals required off peak
Traffic Management by Roadway TM - 01757 322131
|
Two-way traffic signals
|
28 Jan 2026 |
31 Oct 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: SB77722567322
|
| Elm Tree Avenue |
New connections
From Belsay Close to Foxwood Drive
2 Way Signals required 24/7 manned 7 to 7
Traffic Management by Sunbelt - 03700 500792
|
Two-way traffic signals
|
27 Apr 2026 |
12 Jun 2026 |
Northern Powergrid
contact details (opens in a new window)
Reference: JD213DI78603
|
| High Lane |
works clear duct blockages in carriageway.
Fibrenest/GCU Utilities
Rolling Temp lights off peak only
TM by GCU 07736642745
|
Multi-way traffic signals
|
9 Jun 2026 |
11 Jun 2026 |
Open Fibre Networks Ltd
contact details (opens in a new window)
Reference: UX012165MALTBY1V
|
| High Street |
Junction with Wynyard Road, Works to replace fire hyrdrant cover.
NWL/United Living
Traffic management by Beacon Tm - 07841338240.
M/way signal removed when works not taking place.
|
Multi-way traffic signals
|
8 Jun 2026 |
10 Jun 2026 |
Northumbrian Water
contact details (opens in a new window)
Reference: JF001M1914121
|
| Ingleby Way |
Drainage CCTV survey and silt clearance
Junction with Thornaby Road roundabout
Lane closures required off peak
|
Lane closure
|
3 Jun 2026 |
5 Jun 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: SB22248787359
|
| Mitchell Avenue |
Cycleway Scheme
From Farm Foods Bus Stop to Millbank Lane roundabout
Lane closures required off peak
|
Lane closure
|
9 Mar 2026 |
12 Jul 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: SB777TTD-MILLBANK_MITCH
|
| Mitchell Avenue |
Cycleway Scheme
After Farm Foods bus top to roundabout
Lane closures required off peak
Traffic Management by Roadway TM - 01757 322131
|
Lane closure
|
9 Mar 2026 |
12 Jul 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: SB777TTD-MILLBANK_MITCH
|
| Nelson Terrace, Stockton-on-Tees |
Excavate to replace 2 damaged manhole cover and frames
Outside The Arc
Lane closure required 7 to 7
|
Lane closure
|
14 Jun 2026 |
14 Jun 2026 |
Northumbrian Water
contact details (opens in a new window)
Reference: JF001AS4000-7683
|
| Portrack Lane |
New connection
Roundabout with Holme House Road
Lane Closures required 20:00 to 06:00hrs
|
Lane closure
|
18 May 2026 |
15 Jun 2026 |
Northern Powergrid
contact details (opens in a new window)
Reference: JD223U19047563M
|
| Queen Elizabeth Way |
Temporary prohibition of driving - west side of northbound carriageway.
Temporary 40mph speed limit (full length) - from 7th July 2025 until November 2026
|
Temporary speed limit
|
7 Jul 2025 |
26 Jun 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
|
| Queen Elizabeth Way |
Temporary prohibition of driving - west side of northbound carriageway.
Temporary 40mph speed limit (full length) - from 7th July 2025 until November 2026
|
Road closure
|
12 May 2025 |
7 Jul 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
|
| Road Leading To South Layton |
Road Leading To South Layton, Thorpe Larches
|
No right turn
|
13 Jun 2026 |
13 Jun 2026 |
BT
contact details (opens in a new window)
Reference: BC008WG9VP89ZSB
|
| Stockton Road |
Stockton Road, Sedgefield
|
Road closure No right turn
|
13 Jun 2026 |
13 Jun 2026 |
BT
contact details (opens in a new window)
Reference: BC008WG9VP89ZSB
|
| Stockton Road |
Road Leading To Homelands, Thorpe Larches
|
No right turn
|
13 Jun 2026 |
13 Jun 2026 |
BT
contact details (opens in a new window)
Reference: BC008WG9VP89ZSB
|
| Thornaby Road |
Cycleway Scheme
Spitfire roundabout
Lane closures required 24/7
|
Lane closure
|
6 May 2026 |
14 Aug 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: SB777TTD-SPITFIRE_THORN
|
| Thornaby Road |
Cycleway Scheme
From 593 Thornaby Road to Shell Petrol Station
Lane closures required 24/7
|
Lane closure
|
9 Mar 2026 |
16 Jun 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: SB777TTD-A1045_A174JNC
|
| Thorpe Leazes Lane |
Cabling and joint box works
Grindon Crossroads
Multi Way Signals required manned
Traffic Management by Sunbelt - 01452 418660 Option 3
|
Multi-way traffic signals
|
13 Jun 2026 |
13 Jun 2026 |
BT
contact details (opens in a new window)
Reference: BC008WG9VP89Z02SB
|
| Trenchard Avenue |
Cycleway Scheme
Junction with Spitfire roundabout to Sherwood Road
Lane closures required 24/7
|
Lane closure
|
6 May 2026 |
14 Aug 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: SB777TTD-SPITFIRE_TRENCH
|
| Trenchard Avenue |
Cycleway Scheme
From roundabout to Farm Foods access
Lane closures required off peak
Traffic Management by Roadway TM - 01757 322131
|
Lane closure
|
9 Mar 2026 |
12 Jul 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
Reference: SB777TTD-MILLBANK_TRENC
|
| Urlay Nook Road |
New connection
From near Level Crossing to roundabout A67
Rolling 2 Way and Multi Way Signals required 24/7 manned at peak times
Traffic Management by Sunbelt - 03700 500792
|
Multi-way traffic signals
|
13 Apr 2026 |
19 Jun 2026 |
Northern Powergrid
contact details (opens in a new window)
Reference: JD223U19047563F
|
| Westland Way |
Installation of HV cable duct for Amazon site
Westland Way roundabout
Road closure - 19:00 Friday 5th June to 05:00 Monday 8th June
|
Road closure
|
5 Jun 2026 |
8 Jun 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
|
| Wynyard Road |
High Speed works
Between A177 Durham Road and Wolviston Mill Lane
|
Road closure
|
7 Jun 2026 |
7 Jun 2026 |
Stockton-on-Tees Borough Council
contact details (opens in a new window)
|
| Yarm Back Lane |
Diversion works
Near junction with Darlington Back Lane
2 Way Signals required 24/7 manned 7 to 7
Traffic Management by Premier TM - 07903 712304
|
Two-way traffic signals
|
14 Apr 2026 |
19 Jun 2026 |
Northern Gas Networks
contact details (opens in a new window)
Reference: XX074003900184353
|
| Yarm Lane |
Excavate on existing valve chamber to renew cover.
Junction with Bowesfield Lane
Multi Way Signals required manned
Traffic Management by Beacon TM - 07841 338240
|
Multi-way traffic signals
|
5 Jul 2026 |
5 Jul 2026 |
Northumbrian Water
contact details (opens in a new window)
Reference: JF001M1924351
|