When will my road be adopted?
This is dependent upon the developer completing the highway works to the satisfaction of the Council's Engineer. For details contact John McMahon.
When will my road be adopted?
- Are there any restrictions for dropped crossing construction?
- Can a farmer plough a public path?
- Can I use my own contractor to construct a pavement crossing?
- For new developments who is responsible for cleaning mud off the highway?
- How do I get a private street adopted?
- How do I report damage to the footpath/Road?
- How do I request a drop crossing?
- How long does it take to construct a pavement crossing?
- How much does it cost for a pavement crossing?
- I want to be able to access my drive by car, with a dropped kerb. What is involved?
- Is my street adopted by the Council?
- May I give my house a name?
- The drains are blocked/smelling?
- What can I take with me on a public path?
- What if my road or footpath does not meet required intervention levels?
- What is a general maintenance repair?
- What is a shared surface?
- What work is involved for the cost?
- What's my post code?
- When will my road be adopted?
- Where can I view the Definitive Map showing all recorded public rights of way?
- Who do I report problems about a public path to?
Contact Us
Contact: Urban Design
72 Church Road,
Stockton-on-Tees
TS18 1TW
Tel: 01642 526709
Fax: 01642 528217
Email:
urbandesign
@stockton.gov.uk
Map of Gloucester House |
